K-Electric has launched a safety awareness campaign.
The Senate has been told that additional gas is being provided to K-Electric for curtailing load-shedding.
A four-member investigation team of NEPRA has returned to Islamabad after reviewing the situation regarding prolonged and unannounced load shedding in Karachi. A four-member team led by DG Monitoring and
KARACHI, July 16 (Online): K-Electric spokesperson Adil Murtaza has said load-shedding is observed in those areas of Karachi where power pilferage occurs. Talking to a private TV channel here Thursday
Karachi, 15th July: Karachi continues to face prolonged power cuts in the sweltering heat. According to Baaghi TV, the people of Karachi are still facing prolonged power failures amid hot
KARACHI, July 14 (Online): Amid severe load shedding one unit of Bin Qasim power plant has been shut by K-Electric stalling 130 megawatt power production. The loadshedding hours have also
Baaghi TV: A 14-year-old boy was electrocuted due to negligence of K Electric in Korangi area of Karachi. According to the residents of the area, the accident took place due
Cable Operators Association of Pakistan (COAP) Chairman, Khalid Arain, called off a strike in Karachi for 2 hours on Monday (today). According to the details, the cable operators association has
According to reports, Federal Minister Asad Omar has said that gas and fuel are being supplied to K Electric. 77% areas of Karachi should not have load shedding. If K
ISLAMABAD: K-Electric has opened a pool of incompetence and lies, important revelations continue, according to reports, the Ministry of Energy has opened a pool of lies of the electricity distribution